1. How does the work breakdown structure (WBS) differ from the project network?
2. How are WBS and project networks linked?
3. Why bother creating a WBS? Why not go straight to a project network and forget the WBS?
4. Why is slack important to the project manager (PM)?
5. What is the difference between free slack and total slack?